• News
  • Sport
  • TV
  • Radio
  • Education
  • TV Licences
  • Contact Us
  • SOUTH AFRICA
  • POLITICS
  • BUSINESS
  • SPORT
  • AFRICA
  • WORLD
  • FEATURES
  • OPINION
No Result
View All Result
1
Home Sci-tech

Fuel leak to delay first launch of NASA’s Artemis moon rocket for weeks

5 September 2022, 12:31 AM  |
Reuters Reuters |  @SABCNews
NASA's next-generation moon rocket, the Space Launch System (SLS) with the Orion crew capsule perched on top, stands on launch complex 39B as it is prepared for launch for the Artemis 1 mission at Cape Canaveral, Florida, US September 3, 2022.

NASA's next-generation moon rocket, the Space Launch System (SLS) with the Orion crew capsule perched on top, stands on launch complex 39B as it is prepared for launch for the Artemis 1 mission at Cape Canaveral, Florida, US September 3, 2022.

Image: Reuters

NASA's next-generation moon rocket, the Space Launch System (SLS) with the Orion crew capsule perched on top, stands on launch complex 39B as it is prepared for launch for the Artemis 1 mission at Cape Canaveral, Florida, US September 3, 2022.

For the second time in a week, NASA on Saturday aborted an attempt to launch its giant, next-generation rocketship, citing a stubborn fuel leak that the space agency said could delay the debut mission of its moon-to-Mars Artemis program by at least several weeks.

Preflight operations were called off for the day about three hours before the 2:17 p.m. EDT (1817 GMT) liftoff time targeted for the 32-story-tall Space Launch System (SLS) rocket and its Orion capsule from Cape Canaveral, Florida.

The uncrewed test flight, aimed at launching the capsule out to the moon and back, was to have marked the inaugural voyage of both the SLS and Orion a half century after the last lunar mission of Apollo, forerunner of the Artemis program.

The countdown was scrubbed after Kennedy Space Center technicians made three failed attempts to fix a “large” leak of supercooled liquid hydrogen propellant being pumped into the rocket’s core-stage fuel tanks, agency officials said.

The initial launch try on Monday was likewise foiled by technical problems, including a different leaky fuel line, a faulty temperature sensor and cracks found in insulation foam.

Mission managers proceeded with a second launch attempt on Saturday once the earlier issues had been resolved to their satisfaction. And NASA had reserved another backup launch time, for either Monday or Tuesday, in case a third try was needed.

But after a review of data from the latest difficulties, NASA concluded the new hydrogen leak was too tricky and time-consuming to finish troubleshooting and fix on the launch pad before the current launch period allotted to the mission expires on Tuesday.

The delay means the earliest opportunity to try again would come during the next launch period that runs Sept. 19-30, or during a subsequent October window, an associate NASA administrator, Jim Free, told reporters at a late-afternoon briefing.

He said the postponement also would involve rolling the spacecraft back into its assembly building, under Cape Canaveral “range” rules limiting how long a rocket may remain at its launch tower before undergoing a new round of safety checks indoors.

Mike Sarafin, NASA’s Artemis mission manager, said efforts to resolve the latest technical snag would entail “several weeks of work.”

NASA chief Bill Nelson said earlier in the day that a rollback would postpone the next launch attempt at least until mid-October, in part to avoid a scheduling conflict with the next International Space Station crew due for launch early that month.

Launch-day delays and malfunctions are not uncommon in the space business, especially for new rockets such as NASA’s Space Launch System, a complex vehicle with a set of pre-liftoff procedures that have yet to be fully tested and rehearsed by engineers without a hitch.

On average, the odds of scrubbing a launch on any given day for any reason, including foul weather, are about one-in-three.

“We’re not going to launch until it’s right, and that is standard operating procedure, and will continue to be,” Nelson said at the briefing.

The last-minute setbacks on the launchpad came at the tail end of a development program more than a decade in the making, with years of delays and billions of dollars in cost overruns under NASA’s respective SLS and Orion contracts with Boeing Co (BA.N) and Lockheed Martin Corp (LMT.N).

MOON TO MARS

Apart from its technical challenges, Artemis I signals a major turning point for NASA’s post-Apollo human spaceflight program, after decades focused on low-Earth orbit with space shuttles and the International Space Station.

Named for the goddess who was Apollo’s twin sister in ancient Greek mythology, Artemis aims to return astronauts to the moon’s surface as early as 2025, though many experts believe that time frame will likely slip.

Twelve astronauts walked on the moon during six Apollo missions from 1969 to 1972, the only spaceflights yet to place humans on the lunar surface. But Apollo, born of the US-Soviet space race during the Cold War, was less science-driven than Artemis.

The new moon program has enlisted commercial partners such as SpaceX and the space agencies of Europe, Canada and Japan to eventually establish a long-term lunar base of operations as a stepping stone to even more ambitious human voyages to Mars.

Getting the SLS-Orion spacecraft launched is a key first step. Its first voyage is intended to put the 5.75-million-pound vehicle through its paces in a rigorous test flight pushing its design limits and aiming to prove the spacecraft suitable to fly astronauts.

If the mission succeeds, a crewed Artemis II flight around the moon and back could come as early as 2024, to be followed within a few more years with the program’s first lunar landing of astronauts, one of them a woman, with Artemis III.

Billed as the most powerful, complex rocket in the world, the SLS represents the biggest new vertical launch system NASA has built since the Saturn V of the Apollo era.

Although no humans will be aboard, Orion will carry a simulated crew of three – one male and two female mannequins – fitted with sensors to measure radiation levels and other stresses that real-life astronauts would experience.

Share article
Tags: NASA
Previous Post

Search for survivors after two die in Lagos building collapse

Next Post

Brazil’s Lula says easing gun access is not on his agenda, education is

Related Posts

A tap with a droplet of water.

UN Water Conference kicks off as world marks World Water Day

22 March 2023, 9:30 PM
Rahima Moosa Mother and Child Hospital, the Old Coronation Hospital.

“Report exposes state of Gauteng public health facilities”

15 March 2023, 11:09 AM
Members of Nehawu on strike

Phaahla links four deaths to Nehawu’s wage strike

9 March 2023, 1:00 PM
Silhouettes of mobile users are seen next to a screen projection of Instagram logo in this picture illustration taken March 28, 2018.

Instagram down for thousands of users globally

9 March 2023, 7:33 AM
(File Image) A nurse at one of South Africa's hospital during the height of the coronavirus pandemic.

Patients suffer as health workers strike

9 March 2023, 7:30 AM
A representation of depression

Negative impact of rolling blackouts on mental health

7 March 2023, 5:56 PM
Next Post
Former Brazilian President and current presidential candidate Luiz Inacio Lula da Silva speaks during a campaign rally in Manaus, Brazil August 31, 2022.

Brazil's Lula says easing gun access is not on his agenda, education is

Most Viewed

  • 24hrs
  • Week
  • Month
  • Public sector unions accept revised 7.5% wage increase
  • ‘Medupi Power Station’s design ‘flaws’ deliberate to cost taxpayers money’
  • Zimbabwe Reserve Bank faces sanctions over money laundering accusations
  • UPDATE: Oscar Pistorius denied parole
  • UJ, TUT named hubs of Artificial Intelligence
  • Corporates prepare for a possible national blackout
  • Unions set the record on wage settlement agreement reports
  • UPDATE | Court hears evidence regarding Zuma’s medical records
  • Public sector unions accept revised 7.5% wage increase
  • SABC News crew attacked on N2 while monitoring protests
  • Eight killed in Limpopo N1 crash
  • UPDATE | Five suspects killed during shootout with police in Durban
  • SABC News distances itself from fake news post
  • Residents in Durban flat where suspects killed left reeling
  • Eskom hands back operations of Uganda’s power stations

LATEST

Police badge.
  • South Africa

Police lauded for bringing down murder and drug dealing suspects


SA MotoGP rider Brad Binder
  • Sport

Binder ‘fights like hell’ to win Argentina sprint from 15th on grid


A soccer player on the field.
  • Sport

Orlando Pirates move to second spot on DSTV Premiership log


Mamelodi Sundowns players at the Loftus Versfeld Stadium.
  • Sport

Mamelodi Sundowns make it six PSL titles in a row


Crime scene tape
  • South Africa

Residents in Durban flat where suspects killed left reeling


EFF members cleaning a dumpsite
  • Politics

Malema takes Andries Tatane clean-up campaign to Limpopo


Weather

  • About the SABC
  • Contact Us
  • Jobs
  • Advertise
  • Disclaimer
  • Site Map

SABC © 2023

No Result
View All Result
  • SOUTH AFRICA
  • POLITICS
  • BUSINESS
  • SPORT
  • AFRICA
  • WORLD
  • FEATURES
  • OPINION

© 2023

Previous Search for survivors after two die in Lagos building collapse
Next Brazil’s Lula says easing gun access is not on his agenda, education is