• News
  • Sport
  • TV
  • Radio
  • Education
  • TV Licences
  • Contact Us
  • SOUTH AFRICA
  • POLITICS
  • BUSINESS
  • SPORT
  • AFRICA
  • WORLD
  • FEATURES
  • OPINION
No Result
View All Result
1
Home mobile-leadstory

Gordhan ill-advised on electricity issue: Blom

4 April 2019, 9:40 AM  |
SABC SABC |  @SABCNews
Minister Pravin Gordhan says should there be load shedding, it will be limited to Stage 1.

Minister Pravin Gordhan says should there be load shedding, it will be limited to Stage 1.

Image: SABC News

Minister Pravin Gordhan says should there be load shedding, it will be limited to Stage 1.

Mining and Energy adviser Ted Blom says Public Enterprises Minister Pravin Gordhan is putting the country at a risk of a total power shutdown.

This as Eskom promised to work hard to keep lights on this coming winter.

Gordhan gave an update on the power grid and plans to stabilise electricity supply at a media briefing on Wednesday.

Joined by executives from the power utility, Gordhan ruled out load shedding, reducing it to occasional stage 1 power cuts should it happen.

Speaking on Morning Live, Blom says the Minister has said Eskom is short of critical skills which means he is being advised by skills which are not sufficient.

He says you cannot dictate load shedding schedules, if systems operators need to shed more and they don’t, there will be a grid melt down.

Talking about aging infrastructure, Blom says Oil transformers need an oil change every seven years, but unfortunately they run forever.

He says: “Eskom cannot even do an oil change once every seven years. Captures want the transformers to blow up so more commission can be made from replacing them.”

Watch interview below:

Meanwhile Chief Executive at Eskom, Phakamani Hadebe, says Eskom will spend R45 billion on maintenance over the next five years.

Hadebe has encouraged South Africans to continue to save power and says public participation during March’s load shedding put a thousand megawatts back onto the grid.

He says the construction of Kusile and Medupi is 80% close to completion and cannot be abandoned as the projects will benefit the country in the long term.

Share article
Tags: ElectricityLoad sheddingPravin GordhanTed BlomEskom
Previous Post

MIT halts collab with Huawei and ZTE over US federal investigations

Next Post

New Zealand mosque massacre suspect to face 50 murder charges

Related Posts

New born baby in hospital.

South Africa sees alarming spike in Fetal Alcohol Disorder rate

11 September 2023, 8:25 AM
Prof Bruce Mellado, chair of the local organising committee interacts with media ahead of the TIPP conference. The event brings together specialists from around the world to share best practice on Technology in Instrumentation and Particle Physics.

TIPP conference in Cape Town focusses on technological advancements

5 September 2023, 12:00 PM
FILE PHOTO - An internet cable is seen at a server room in this picture illustration taken in Warsaw January 24, 2012. REUTERS/Kacper Pempel

INFOGRAPHIC: All you need to know about the SA undersea broken internet cables

18 August 2023, 7:21 PM
Logo of SiyaTutor, an AI-driven WhatsApp-based tutor chatbot designed to assist school learners in their educational journey.

WhatsApp combines AI in SiyaTutor for personalised learning

13 August 2023, 1:31 PM
FILE PHOTO: Twitter logo and a photo of Elon Musk are displayed through magnifier in this illustration taken October 27, 2022.

Elon Musk says Twitter’s blue bird to be replaced by an X

24 July 2023, 9:28 AM
Meta's Threads app and Twitter logos are seen in this illustration taken July 4, 2023.

Zuckerberg-Musk fights first round: Meta launches ‘Twitter Killer’ Threads app

6 July 2023, 7:29 AM
Next Post
Flowers-and-cards-seen-at-Christchurch-shooting.

New Zealand mosque massacre suspect to face 50 murder charges

Most Viewed

  • 24hrs
  • Week
  • Month
  • High waves and rough water conditions force beach closures in the Western Cape
  • UPDATE: Public warned not to go to W Cape beaches as another spring tide expected
  • Spring high tide leaves trail of destruction along Garden Route
  • ‘Buthelezi was a good man who did a bad man’s job’
  • A Celebration of a Legacy: Amabutho, IFP pay final tribute to Prince Buthelezi
  • High waves and rough water conditions force beach closures in the Western Cape
  • Prince Mangosuthu Buthelezi to rest in the town he built and nurtured
  • NSPCA files criminal case against Julius Malema for alleged animal cruelty
  • Snow, heavy rainfall expected in parts of KZN: SAWS
  • Cold-front sweeps across SA bringing snow and chilly temperatures
  • Concern over exclusion of foreign nationals from Road Accident Fund
  • Limpopo multi-million rand water treatment, sewage project abandoned
  • R103 to be closed for demolition of Lynnfield Bridge on N3 towards Durban
  • AfriForum seeks Justice Keightley’s recusal in ‘Kill the Boer’ case
  • Renowned academic, historian Henry Bredekamp passes away

LATEST

Rain
  • South Africa

Gqeberha on high-alert following disruptive weather warnings


Israeli Prime Minister Benjamin Netanyahu
  • World

Israel on cusp of region-reshaping peace with Saudi Arabia, Netanyahu says


  • Politics

SA hopes to gain insights from China’s developmental agenda


  • South Africa

231 rhinos lost to poaching in SA this year, ongoing concerns on World Rhino Day


[FILE IMAGE] A fire destroys residential properties.
  • South Africa

ANC building up in flames in Port St Johns


  • South Africa

Joburg Water monitors troubled water systems closely


Weather

  • About the SABC
  • Contact Us
  • Jobs
  • Advertise
  • Disclaimer
  • Site Map

SABC © 2023

No Result
View All Result
  • SOUTH AFRICA
  • POLITICS
  • BUSINESS
  • SPORT
  • AFRICA
  • WORLD
  • FEATURES
  • OPINION

© 2023

Previous MIT halts collab with Huawei and ZTE over US federal investigations
Next Flowers-and-cards-seen-at-Christchurch-shooting. New Zealand mosque massacre suspect to face 50 murder charges